Kit Hybrid 15 kW + 16kWh

Triple-phase 400V
Hybrid/with battery
12 500 €

Single-phase hybrid 6 kW / 8.12 kWp kit for medium-sized homes. Deye inverter, Longi Solar 580W panels (14 pcs). The system supports battery connection (ESS), provides backup power during grid outages, and allows selling excess to the grid. Ready for expansion — add a battery later. Start saving from day one!

High power for large homes or small businesses 14.95 kWp covers the consumption of a property with multiple high-power appliances.
23 Longi 650W panels Superior efficiency and stable generation even on cloudy days.
Deye 12 kW hybrid inverter Full ESS battery support and advanced monitoring.
Reliable backup power During grid outages, the system keeps fridge, lights, pumps, and other essential loads running.
Efficient storage 16.24 kWh LiFePo4 battery stores generated energy for evening/night use.
Sell surplus to the grid Get compensated for unused electricity (Net Metering).
Balanced three-phase architecture Optimal load distribution for high-power consumers (appliances, pumps, AC).
Fast payback 5–7 years Optimized investment + selling excess + protection against tariff increases.
Complete turnkey service Design, installation, paperwork, and commissioning.
Basic parameters
System type Hybrid
Phase Three-phase (400V)
Inverter nominal power 12 kW
Installed panel power 14.95 kWp
Connection type With battery support (ESS)
Solar panels
Panel manufacturer Longi Solar
Power per panel 650 W
Number of panels 23 pcs
Total power 14.95 kWp
Inverter
Model Deye Hybrid
Power 12 kW
Type Hybrid inverter
Monitoring support Yes
Battery
Type LiFePO4 (LFP)
Capacity 16.24 kWh
Quantity 1 pc
Electrical & connection
Current type DC → AC (400V)
Grid connection Backup power + Net Metering
Protection Residual current + automatic circuit breaker

What's included

Complete turnkey solution

Mounting structure (roof mounting systems)
AC panel (RCD, circuit breakers)
Project documentation (design, warranty contract)
Cables, terminals, MC4 connectors, mounting accessories
Installation of the photovoltaic system
Equipment delivery to the site
Commissioning and connection to the Premier Energy grid
Take the First Step Towards Clean Energy!