Kit Hybrid 10 kW + 16 kWh

Single-phase 230V
Hybrid/with battery
8 600 €

Single-phase hybrid 6 kW / 9.92 kWp kit with 16 kWh battery for medium-sized homes. Deye inverter, Longi Solar 620W panels (16 pcs). Provides backup power during grid outages, allows selling excess to the grid, and stores energy for evening peak consumption. Safe LiFePO4 battery rated for >6000 cycles. Start saving from day one!

Optimal power for a medium home 6 kW / 9.92 kWp covers the needs of a family of 3–5 people with electrical appliances.
More panels — more generation 16 panels of 620W each provide high output even on cloudy days.
Store energy for evening 16 kWh battery stores daytime energy for peak evening consumption.
Backup power During grid outages, the system switches to battery — fridge, lights, and outlets keep working.
Sell surplus to the grid As a prosumer, you get compensated for electricity you export (Net Metering).
Reliable Deye inverter Proven equipment with monitoring and remote management.
Safe LiFePO4 battery >6000 cycles, maintenance-free, overheating protection.
Fast payback 5–7 years Lower bills + selling excess + protection against tariff increases.
Complete turnkey service Design, installation, paperwork, and commissioning.
Basic parameters
System type Hybrid
Phase Single-phase (230V)
Inverter nominal power 6 kW
Installed panel power 9.92 kWp
Connection type With battery support (ESS)
Solar panels
Panel manufacturer Longi Solar
Power per panel 620 W
Number of panels 16 pcs
Total power 9.92 kWp
Inverter
Model Deye Hybrid
Power 6 kW
Type Hybrid inverter
Monitoring support Yes
Battery
Type LiFePO4 (LFP)
Capacity 16 kWh
Quantity 1 pc
Electrical & connection
Current type DC → AC (230V)
Grid connection Backup power + Net Metering
Protection Residual current + automatic circuit breaker

What's included

Complete turnkey solution

Mounting structure (roof mounting systems)
AC panel (RCD, circuit breakers)
Project documentation (design, warranty contract)
Cables, terminals, MC4 connectors, mounting accessories
Installation of the photovoltaic system
Equipment delivery to the site
Commissioning and connection to the Premier Energy grid