Kit Hybrid 8 kW
Single-phase 230V
Hybrid/with battery
7200 €
5 800 €
Single-phase hybrid 6 kW / 8.12 kWp kit for medium-sized homes. Deye inverter, Longi Solar 580W panels (14 pcs). The system supports battery connection (ESS), provides backup power during grid outages, and allows selling excess to the grid. Ready for expansion — add a battery later. Start saving from day one!
| 8.12 kWp power for a medium home | Covers the needs of a family of 3–4 people with essential electrical appliances. |
| 14 Longi 580W panels | High efficiency and stable generation even on cloudy days. |
| Deye 6 kW hybrid inverter | Battery support (ESS) — install a battery now or add it later. |
| Backup power | During grid outages, the system keeps your fridge, lights, and outlets running. |
| Sell surplus to the grid | Earn money from electricity you don't use (Net Metering). |
| Ready for expansion | Start without a battery and add one in a year when your budget allows. |
| Simple single-phase installation | Perfect for a typical home without upgrading to three phases. |
| Fast payback 4–6 years | Low initial investment + selling excess + protection against tariff increases. |
| Complete turnkey service | Design, installation, paperwork, and commissioning. |
| Basic parameters | |
| System type | Hybrid |
| Phase | Single-phase (230V) |
| Inverter nominal power | 6 kW |
| Installed panel power | 8.12 kWp |
| Connection type | With battery support (ESS) |
| Solar panels | |
| Panel manufacturer | Longi Solar |
| Power per panel | 580 W |
| Number of panels | 14 pcs |
| Total power | 8.12 kWp |
| Inverter | |
| Model | Deye Hybrid |
| Power | 6 kW |
| Type | Hybrid inverter |
| Monitoring support | Yes |
| Electrical & connection | |
| Current type | DC → AC (230V) |
| Grid connection | Backup power + Net Metering |
| Protection | Residual current + automatic circuit breaker |
What's included
Complete turnkey solution
Mounting structure (roof mounting systems)
AC panel (RCD, circuit breakers)
Project documentation (design, warranty contract)
Cables, terminals, MC4 connectors, mounting accessories
Installation of the photovoltaic system
Equipment delivery to the site
Commissioning and connection to the Premier Energy grid
Take the First Step Towards Clean Energy!